Replacement of Oswego Bridge (Regional Road 45)
All Niagara Region projects
About the project
The Oswego Creek Bridge on Creek Road (Regional Road 45) between Diltz Road and Marshagan Road in Wainfleet is currently closed to replace the Oswego Creek bridge structure.
We will replace the structure with a new two lane structure, including on road active transportation. This will include an earth retention system to minimize the impact to the natural environment.
The replacement bridge structure will also be elevated to minimize the higher water levels and improve public safety.
The Oswego Creek Bridge Replacement is a component of the completed Municipal Class Environmental Assessment.
Project timeline
Fall 2021 - Completed
Complete Environmental Assessment
January 2022 - completed
Close Oswego Creek bridge structure
February 2022 - completed
Detailed design on the bridge replacement
March 2024 - completed
Award tender for bridge structure replacement
May 2024 - completed
Construction postponed due to archaeological investigation
Spring 2025 to Summer 2025
Start construction
Contact
Mike Wilson, A.Sc.T., PMP
Manager, Capital Projects, Transportation Engineering
Niagara Region
905-980-6000 ext. 3183
Email Mike Wilson
Construction updates
- The bridge is closed to vehicular, cycling and pedestrian traffic
- Creek Road (Regional Road 45) is closed at this location and a road detour is in place
- Archaeological investigation is underway
Property acquisitions
Parts of Creek Road (Regional Road 45) Plan 2 may not be easy to use for people with limited vision, blindness or mobility issues that make it hard to use a mouse. It also has some features that might not work well for everyone.
If you need this document in a more accessible format or help understanding it, contact us.
Environmental Study Report
- Environmental Study Report
- Appendix A: Transportation and Traffic Analysis
- Appendix B: Geotechnical and Hydrogeology Report
- Appendix C: Environmental Impact Study
- Appendix D: Cultural Heritage Report
- Appendix E: Cultural Heritage Evaluation and Heritage Impact Assessment
- Appendix F: Stage One Archaeological Assessment
- Appendix G: Design Drawings Section 1
- Appendix G: Design Drawings Section 2
- Appendix G: Design Drawings Section 3
- Appendix G: Design Drawings Section 4
- Appendix G: Design Drawings Section 5
- Appendix G: Design Drawings Section 6
- Appendix G: Design Drawings Section 7
- Appendix G: Design Drawings Section 8
- Appendix H: Record of Consultation