Smithville Trunk Sewer Upgrade
All Niagara Region projects

About the project

Niagara Region is carrying out a study to identify the preferred Smithville sewer alignment. The sewer will carry flows from Smithville to the Baker Road Wastewater Treatment Plant.

This study will:

  • Examine the capacity and size needed for the proposed Smithville sewer to support growth in West Lincoln and Grimsby
  • Define the problems and opportunities with the site
  • Develop and evaluate alternative strategies
  • Determine the most feasible solution
  • Identify methods to avoid or minimize impacts on the community and natural environment

Project timeline

April 2026
Notice of commencement

Spring 2026
Background review and field investigations

Summer / Fall 2026
Identification and evaluation of alternatives

Winter 2026
Public Information Centre

SPRING 2027
Project file report and notice of study completion

Contact

Darynne Hagen, P.Eng.
Project Manager, Water and Wastewater Engineering
Niagara Region
365-855-3581
Email Darynne Hagen

Matt Fisher, P.Eng.
GEI Consultants
Project Manager
416-312-2858