The Lakeshore Road Culvert is in St. Catharines on Lakeshore Road (Regional Road 87), about 360 metres east of Geneva Street. It carries Spring Garden Creek under Lakeshore Road.

The existing structure is a steel multi-plate arch culvert. It spans about 3.5 metres.

A full replacement is recommended because the structure is in poor condition.

Project timeline

Fall 2024 - Completed
Get a consultant

Summer 2025 - in progress
Detailed design

Winter 2026
Issue tender for construction

Spring 2026
Relocate utilities

Summer 2026
Construction

Contact

Mike Keller, C.E.T., PMP
Project Manager, Transportation Engineering
Niagara Region
905-980-6000 ext. 3265
Email Mike Keller

Alex Ellis, P.Eng.
Project Manager
ELLIS Engineering Inc.
214 Martindale Rd., Suite 201
alex@ellis.on.ca

Local Information

The construction is expected to include a full road closure and a signed detour. Timing and length are still to be determined. We will notify the public of any impacts on vehicle and pedestrian traffic as the project moves forward.

Property acquisitions are not expected. If the project affects private property, a team member will contact the owners directly.

Image Gallery


Lakeshore road culvert map
Lakeshore Road Culvert
This map shows the Lakeshore Road Culvert location on Lakeshore Road (Regional Road 87) in St. Catharines
Page Feedback Did you find what you were looking for today?