Glenridge Avenue (Regional Road 50) CNR Bridge Replacement
All Niagara Region projects
About the project
The Glenridge Avenue CNR Bridge was built in 1949. It is in St. Catharines, about 600 metres north of Glen Morris Drive where it crosses the CN railway.
Niagara Region plans to replace the bridge, with design starting in 2025 and construction in 2027.
The public will be notified of any impacts to vehicular and pedestrian traffic as the project advances.
Project timeline
2025
Start design
2028
Start construction
Contact
Niall Kerrigan, P.Eng.
Manager, Capital Projects, Transportation Engineering
Niagara Region
Email Niall Kerrigan
Glenridge Avenue CNR Bridge