West Lincoln Combined Sewer Overflows at Niagara Region Facilities

Data presented here is updated every three months. The data contains records from
September 01, 2023 to August 31, 2024.

Volume is measured in megalitres. (1 megalitre = 1 million litres)

CSO Location Date of Overflow Volume (ML) Reason for Overflow
Smithville SPS CSO
[map it ]
Jul 17, 2024 6.804 ML Heavy Precipitation
Smithville SPS CSO
[map it ]
Apr 12, 2024 1.751 ML
Heavy Precipitation
Smithville SPS CSO
[map it ]
Jan 26, 2024 6.910 ML Heavy Precipitation
Snow Melt
Smithville SPS CSO
[map it ]
Jan 9, 2024 7.005 ML Heavy Precipitation
Snow Melt
Smithville SPS CSO
[map it ]
Dec 27, 2023 1.089 ML Heavy Precipitation
Snow Melt

Historical Overflow Data for West Lincoln

202320222021
Total Overflows: 9
Total Volume: 17.542 ML
Total Overflows: 6
Total Volume: 18.279 ML
Total Overflows: 5
Total Volume: 15.575 ML

Overflows contain mostly Storm Water

While the volume of an overflow may seem large, the amount of untreated sewage present in the overflow is small when compared to the amount of stormwater or snow melt.

Niagara typically treats about 80,000 megalitres of sewage each year.  The vast majority of wastewater discharged into the sewer system receives full treatment and only a small percentage of this sewage overflows. These overflows usually only occur during periods of heavy rain or during seasonal snow melts.

Historical Data

If you require more detailed information about a specific combined sewage overflow, you can contact the water & wastewater division.

Page Feedback Did you find what you were looking for today?