Quality Inn & Suites - Indoor Pool Inspection Results

Directions on Google Maps

Inspection Results - Posted for two years

Sep. 10, 2026
Routine Inspection

Not in Compliance
Black disc 150 millimetres (6 inches) in diameter on a white background is permanently affixed to the bottom of the pool at its deepest point.
Not in Compliance
All surfaces of pool deck and walls are maintained in a sanitary condition and free from potential hazards.
Not in Compliance
Total Bromine (Br) sanitizer residual is maintained between 2 ppm - 8 ppm.
Not in Compliance
Pool test kit with proper testing chemicals is available.

May. 21, 2026
Re-inspection

No Issues Found
No infractions were found at the time of inspection

May. 13, 2026
Routine Inspection

Corrected During Inspection
Total Bromine (Br) sanitizer residual is maintained between 2 ppm - 8 ppm.
Not in Compliance
Daily turnover rate is acceptable.
Not in Compliance
Pool components are maintained in proper working order.
Not in Compliance
Manual pool tests and records are completed.

Mar. 27, 2026
Routine Inspection

No Issues Found
No infractions were found at the time of inspection

Oct. 24, 2025
Routine Inspection

Not in Compliance
Daily turnover rate is acceptable.

Sep. 19, 2025
Re-inspection

No Issues Found
No infractions were found at the time of inspection

Sep. 18, 2025
Routine Inspection

Not in Compliance
All surfaces of pool deck and walls are maintained in a sanitary condition and free from potential hazards.
Not in Compliance
Daily turnover rate is acceptable.
Not in Compliance
A spine board or device designed for lifting from the pool or spa a person who may have incurred a spinal injury is present on the deck.
Not in Compliance
Total Bromine (Br) sanitizer residual is maintained between 2 ppm - 8 ppm.

May. 9, 2025
Routine Inspection

Not in Compliance
Total Bromine (Br) sanitizer residual is maintained between 2 ppm - 8 ppm.

Feb. 14, 2025
Routine Inspection

Not in Compliance
Manual pool tests and records are completed.
Not in Compliance
All surfaces of pool deck and walls are maintained in a sanitary condition and free from potential hazards.
Not in Compliance
Daily turnover rate is acceptable.

Oct. 9, 2024
Routine Inspection

Not in Compliance
Total Bromine (Br) sanitizer residual is maintained between 2 ppm - 4 ppm.
Page Feedback Did you find what you were looking for today?