Nails by Jade Inspection Results

Directions on Google Maps

Inspection Results - Posted for two years

Jul. 4, 2024
Routine Inspection

Corrected During Inspection
The reprocessing area is designed to prevent contamination.

Jan. 22, 2024
Re-inspection

Corrected During Inspection
Disinfectant records are maintained, documented and accessible.
Not in Compliance
Floors, walls, ceilings, fixtures, surfaces and furniture are in good repair, easily cleanable, of a smooth and impermeable material and maintained in a sanitary manner.

Jan. 8, 2024
Routine Inspection

Not in Compliance
Floors, walls, ceilings, fixtures, surfaces and furniture are in good repair, easily cleanable, of a smooth and impermeable material and maintained in a sanitary manner.
Page Feedback Did you find what you were looking for today?