Rolling Acres Sewage Pumping Station and Forcemain Upgrades
All Niagara Region projects
About the project
Niagara Region owns and operates the Rolling Acres Sewage Pumping Station at 7305 Rolling Acres Cres. in Niagara Falls. The station was constructed in 1962. It needs a complete station upgrade, including replacing the forcemain.
Upgrades will be made to the:
- Pumps
- Meters
- Valves
- Electrical
- Heating, ventilation and air conditioning
- Generator
- Forcemain
Project timeline
Fall 2022 to Winter 2023
Conceptual design
Winter to fall 2023
Detailed design
summer 2024
Public Information Centre
SPRING 2025
Start construction
Contact
Kevin Kortekaas, C. Tech
Niagara Region
Project Manager
905-658-5147
Email Kevin Kortekaas
Rafiq Qutub, M.Eng., P. Eng., PSAP
GM BluePlan Engineering Limited
Project Manager
647-248-7813
rafiq.qutub@gmblueplan.ca