Reconstruction of Lakeshore Road (Regional Road 87) from Townline Road to Konzelmann Winery
All Niagara Region projects

About the Project

Lakeshore Road (Regional Road 87) from Four Mile Creek Road to Townline Road in Niagara-on-the-Lake functions as a two-lane arterial roadway serving east-west traffic flows and provides access to agricultural and residential uses on the roadway. The roadway also provides a commuter linkage from the Old Town to St. Catharines.

The section of Lakeshore Road to be addressed during 2022 construction is located between Townline Road and Konzelmann Winery.

Phase 1 construction from Four Mile Creek to Konzelmann Winery was previously completed. Phase 2 construction between Townline Road and Konzelmann Winery is deficient in terms of road surface condition and drainage. The Region intends to reconstruct this section of roadway to eliminate these deficiencies.

Property inspections

Before construction, the contractor's inspection firm will arrange for an inspection of the interior and exterior of your house or building to determine and document the extent of any cracking or other damage that exists before construction. This information can be used to determine the extent of the contractor's responsibility in the unlikely event that damage to your house or building occurs during construction.

Expected traffic delays

Traffic will be reduced to a single lane for the duration of the project. Drivers can avoid delays by using alternative routes. Any anticipated full closures will be advertised with detours.

Project Timeline

February to December 2021 - completed
Procurement process and approvals

December 2021 - completed
Tender awarded to Rankin Construction Inc.

February 2022 - completed
Contractor onsite to mobilize

Summer 2022
Complete work and demobilize

Contact

Melissa Tomascik
Project Manager
Niagara Region
905-980-6000 ext. 3189
Email Melissa Tomascik

Allan MacLellan
Contractor
Rankin Construction Inc.
905-684-1111
amaclellan@rankinconstruction.ca
After hours emergency: 905-682-2078

Zach Hoover
Inspector
289-219-4161
zhoover@ktheng.ca

This map shows the location on Park Rd. where the new watermain (500 mm) will be constructed to the north and south of Ridge Rd. in Grimsby. It also shows the location of the new Grimsby Water Storage System (15 ml) and the location of the existing water reservoir.
This map shows the location on Park Rd. where the new watermain (500 mm) will be constructed to the north and south of Ridge Rd. in Grimsby. It also shows the location of the new Grimsby Water Storage System (15 ml) and the location of the existing water reservoir.