King Street (Regional Road 81) from Greenlane to Lincoln Avenue
All Niagara Region projects
About the project
Niagara Region is addressing the failing road platform along King Street (Regional Road 81) from Lincoln Avenue to Greenlane in Lincoln. The existing road has reached the end of its lifecycle and requires remediation. This project will provide a complete reconstruction of the road.
The design upgrades include:
- Replacing culverts
- Improving sub-surface drainage
- Repairing and reconstructing the ditches, curb and gutter to improve roadside drainage
- Improving illumination at the intersections
- Widening the road platform to include paved shoulders with painted buffers
- Geometric improvements at the Thirty Road intersection
- Constructing traffic signals at Thirty Road and Lincoln Avenue
This project is being completed in partnership with the Town of Lincoln. It will install new town sewers or replace existing ones to support future improvements and address aging infrastructure.
The proposed work includes a new storm sewer and outlet for a future Thirty Road reconstruction project. It will also replace about 250 metres of existing sanitary sewer and service laterals between Hillview Drive and Lincoln Avenue.
Project timeline
December 20, 2017 - Completed
Public Information Centre #1
Summer to winter 2023 - completed
Tree trimming and removals
September 6, 2023 - completed
Public Information Centre #2
November 2024 - Completed
File Environmental Assessment
Spring 2024 to Spring 2026 - in Progress
Relocate utilities
Summer 2025 - Completed
Issue tender
Fall 2025 - Completed
Award contract
Spring 2026
Expected construction start
Contact
Chris Latham, C.E.T.
Project Manager, Transportation Engineering
Niagara Region
905-980-6000 ext. 3374
Email Chris Latham
Tyler Pitman
Project Manager / Senior Computer-Aided Design Technician
Kerry T. Howe Engineering Ltd.
905-688-6550 ext. 228
tpitman@ktheng.ca
Jemma Lynch
Project Manager, Capital Projects.
Town of Lincoln
905-563-2799 ext. 264
jlynch@lincoln.ca
Reports and Documents
- Pre-construction notice to residents
- Environmental Assessment
- Appendix 1 - Traffic Report
- Appendix 2 - Natural Heritage Report
- Appendix 3 - Stage 1 Archaeological Assessment Report
- Appendix 4 - Stage 2 Archaeological Assessment Report
- Appendix 5 - Cultural Heritage Report
- Appendix 6 - Geotechnical Investigation Report
- Appendix 7 - Environmental Soils Investigation
- Appendix 8 - Recommended Design Drawings
- Appendix 9 - Consultation Materials
- Appendix 10 - Design Criteria
- Appendix 11 - King Street and Thirty Road Intersection Alternatives
- Appendix 12 - Sightline Assessment Study
Some of these documents do not meet accessibility standards. For an accessible format or help understanding them, contact us.
Public Information Centre #2 - Sept. 6, 2023
Public Information Centre #3 - Nov. 24, 2025