Downing Street Transmission Main Replacement
All Niagara Region projects

About the Project

Niagara Region is replacing a 600mm diameter transmission main on Downing Street between Glenridge Avenue and south of Westchester in St. Catharines. The main, which was built in 1911, has reached the end of its useful service life and needs to be replaced.

The City of St. Catharines is undertaking work in this area and is coordinating with Niagara Region on this project.

Although this project isn't considered a road re-construction project due to the construction activity needed for the watermain and city works, it's expected that the existing asphalt roadway and curb will also be replaced as part of this project.

A new 375mm storm sewer will also be installed along Downing Street between the South Drive intersection and 62 Downing St.

Existing city sewers will be relined along Downing Street between Glenridge Avenue to south of Westchester.

Project Timeline

August 2021
Anticipated construction start

December 2021
Base asphalt completed

SPRING 2022
Final top asphalt

Contact

Gordon Bell, C. Tech
Niagara Region
Project Manager
905-980-6000 ext. 3645
Email Gordon Bell

Kerry Howe Jr., P. Eng.
Consultant - Kerry T. Howe Engineering LTD.
Senior Project Manager
905-688-6550 ext. 235
khowe@ktheng.ca

Public Information Centre #1

Local Traffic

Residents of Downing Street will continue to have access. The road will be closed to other traffic.

This map shows the location on Park Rd. where the new watermain (500 mm) will be constructed to the north and south of Ridge Rd. in Grimsby. It also shows the location of the new Grimsby Water Storage System (15 ml) and the location of the existing water reservoir.