2020 Strengthening and Resurfacing Program - Part 2
All Niagara Region projects

About the Project

Niagara Region is starting work on part two of the annual strengthening and resurfacing program on Regional Rd. 81 (Main St. West), Regional Rd. 39 (North Service Rd.), Regional Rd. 14 (Smithville Rd.), Regional Rd. 69 (Twenty Mile Rd.) and Regional Rd. 73 (Fly Rd.). This is needed to increase the lifespan of the road by improving the structural integrity.

The proposed work includes:

  • Replacing selected cross culverts
  • Milling off the top course of asphalt
  • Repairing cracks in the base course asphalt and replacing concrete curbs that are in poor condition
  • Paving new top course asphalt followed by line painting

Project Timeline

october 2020
Repair and resurfacing begins on Regional Rd. 81 (Main St. West) and Regional Rd. 39 (North Service Rd.)

Culvert replacement begins on Regional Rd. 14 (Smithville Rd.), Regional Rd. 69 (Twenty Mile Rd.) and Regional Rd. 73 (Fly Rd.)

spring 2021
Repair and resurfacing resumes on Regional Rd. 14 (Smithville Rd.), Regional Rd. 69 (Twenty Mile Rd.) and Regional Rd. 73 (Fly Rd.)

summer 2021
Expected construction completion

Contact

Melissa Tomascik
Project Manager, Transportation Engineering
905-980-6000 ext. 3189
Email Melissa Tomascik