Mitchelson Park Pool - Outdoor Pool Inspection Results

Directions on Google Maps

Inspection Results - Posted for one year

Aug. 22, 2019
Routine Inspection

Not in Compliance
Minimum of 3 “Admission Standards” signs.
Not in Compliance
Manual pool tests and records completed

June 27, 2019
Routine Inspection

Not in Compliance
Total alkalinity is maintained at a range of 80-120 ppm
Corrected During Inspection
Free available chlorine (FAC) levels adequate maintained between 0.5 ppm – 10 ppm, FAC 1.0 ppm – 10 ppm w. stabilizer
Page Feedback Did you find what you were looking for today?