Clarion Hotel - Indoor Spa Inspection Results

Directions on Google Maps

Inspection Results - Posted for one year

May 27, 2019
Routine Inspection

Not in Compliance
Manual spa tests and records completed

March 7, 2019
Routine Inspection

Corrected During Inspection
Spa chemicals are stored and handled safely.
Corrected During Inspection
pH is maintained at a range of 7.2-7.8
Not in Compliance
Spa with a water volume that exceeds 4,000 L – make-up water is added to the spa during each operating day in an amount that is a minimum of 15 L per bather use, to a maximum of 20 per cent of the total spa volume.
Not in Compliance
Manual spa tests and records completed

Jan. 22, 2019
Routine Inspection

No Issues Found
No infractions were found at the time of inspection

Dec. 7, 2018
Re-inspection

No Issues Found
No infractions were found at the time of inspection

Nov. 23, 2018
Routine Inspection

Not in Compliance
Water meter is provided that registers the volume of all makeup water that is added to the spa.
Corrected During Inspection
pH is maintained at a range of 7.2-7.8
Not in Compliance
Free available chlorine or total bromine is maintained at a range of 5-10 ppm
Not in Compliance
Spa with a water volume that exceeds 4,000 L – make-up water is added to the spa during each operating day in an amount that is a minimum of 15 L per bather use, to a maximum of 20 per cent of the total spa volume.
Not in Compliance
Manual spa tests and records completed

Oct. 3, 2018
Routine Inspection

Corrected During Inspection
Free available chlorine or total bromine is maintained at a range of 5-10 ppm
Not in Compliance
Spa with a water volume that exceeds 4,000 L – make-up water is added to the spa during each operating day in an amount that is a minimum of 15 L per bather use, to a maximum of 20 per cent of the total spa volume.
Not in Compliance
Manual spa tests and records completed
Corrected During Inspection
Shower sign posted in a conspicuous location at every entrance to the spa deck

Aug. 2, 2018
Routine Inspection

Corrected During Inspection
Total alkalinity is maintained at a range of 80-120 ppm
Corrected During Inspection
pH is maintained at a range of 7.2-7.8
Corrected During Inspection
Free available chlorine or total bromine is maintained at a range of 5-10 ppm
Page Feedback Did you find what you were looking for today?